Section 10 ยท The Third Vertical

Construction Division Blueprint

TruLux Construction is the multiplier that turns a $16,000 RE + mortgage transaction into a $100,000+ revenue event. Florida licensing, service tiers, project pipeline, subcontractor management, and the construction-to-perm financing stack.

10โ€“20%
Target Gross Margin
GC management model, no self-perform
$58K+
Revenue Per Integrated Deal
RE + Mortgage + Construction combined
$40Kโ€“$80K
Construction Revenue / Project
Renovation/addition average
0
W-2 Tradespeople Needed
Pure GC management model
๐Ÿ”จ
Why Construction Is the Crown Jewel
The Revenue Multiplier
๐Ÿ’ก
The Logic Ken Pozek Made Explicit: "How do we monetize the same clients as many times as possible?" Pozek owns mortgage and title. TruLux goes further โ€” owning construction means the same buyer who closes on a $350K home and finances through TruLux can then hire TruLux Construction for a $250K renovation. One client relationship, three revenue events: $8,000 mortgage + $8,375 RE commission + $25,000โ€“$50,000 construction margin = $41,375โ€“$66,375 from a single relationship. No other competitor in the Space Coast market offers this.
Space Coast Construction Demand Drivers
  • Aging housing stock โ€” 40%+ of Brevard homes built before 1990, primed for renovation
  • Aerospace relocation buyers want turnkey homes โ€” buyers who can't find perfect existing inventory will build or renovate
  • Waterfront/canal homes are premium โ€” buyers routinely purchase and upgrade for $100Kโ€“$300K over purchase price
  • New construction lots remain available in Palm Bay and Titusville โ€” ground-up builds are viable
  • Investor clients doing DSCR rentals need renovation management between tenants
  • Short-term rental conversions (Port Canaveral, Cocoa Beach) โ€” STR owners pay premium for fast turnaround renovations
The Pure GC Model โ€” Zero Tradespeople on Payroll

TruLux Construction operates as a General Contractor (GC) โ€” it manages projects and subcontractors but employs zero tradespeople directly. This is the critical design decision that keeps overhead near zero and eliminates the largest operational risks in construction (workers comp, OSHA, tools, equipment, slow periods).

Revenue Model
Client pays project total$250,000
Subcontractor costs (80โ€“85%)-$212,500
GC overhead (permits, supervision)-$12,500
TruLux GC Margin (10โ€“12%)$25,000โ€“$30,000
๐Ÿ—๏ธ
Service Tiers & Revenue by Project Type
Phase-Gated Entry Strategy
๐Ÿ”ง
Tier 1 โ€” Renovation & Updates
TruLux Margin: 15โ€“20% ยท $10Kโ€“$40K/project
Kitchen remodels, bathroom renovations, flooring, painting, HVAC upgrades, roofing. Lowest complexity. Fastest turnaround (2โ€“8 weeks). Primary pipeline comes from RE buyers who just closed. Phase 1 focus โ€” build sub network here first.
๐Ÿ 
Tier 2 โ€” Additions & Major Rehabs
TruLux Margin: 12โ€“18% ยท $40Kโ€“$150K/project
Room additions, garage conversions, whole-house remodels, structural repairs, screened pool enclosures, outdoor kitchens. Medium complexity. 8โ€“24 week timelines. Permits required. Florida CGC license mandatory for projects over $75K. Phase 2 focus.
๐Ÿข
Tier 3 โ€” Ground-Up New Construction
TruLux Margin: 10โ€“15% ยท $100Kโ€“$500K+ /project
New residential builds on vacant lots, ADU/in-law suite construction, custom homes. Highest margin dollar amount but most complex. Requires Certified General Contractor license (CGC). 12โ€“18 month timelines. Phase 3 only โ€” after CGC licensure established and sub network proven.
โš ๏ธ
Phase Gate for Each Tier: Start with Tier 1 in Phase 1 โ€” no CGC required under $75K for owner-occupied residential in Florida, subcontractors handle licensed trades. Move to Tier 2 in Phase 2 once you have CGC or a licensed GC partner. Tier 3 requires a fully operational sub network with proven performance, a licensed GC, and dedicated project management staff. Do not skip ahead โ€” construction reputation is unforgiving.
๐Ÿ“‹
Florida Contractor Licensing Requirements
DBPR / CILB Governed
๐Ÿšจ
Florida Unlicensed Contracting Is a Felony: Contracting without a license for projects over the threshold in Florida is a 3rd degree felony (F.S. 489.127). Unlicensed contracting is also a primary mechanism for homeowner fraud and DBPR enforcement. Start with smaller renovation projects (under $75K total project cost, under $25K for HVAC) that subcontractors execute under their own licenses while TruLux manages scope, pricing, and client relationship.
Certified General Contractor (CGC)
F.S. 489.105(3)(a) ยท CILB
Required for: new construction, structural work, projects over $75K, commercial projects. Exam: 4-hour written test covering project management, business/finance, and building codes. Requirements: 4-year degree OR 4+ years supervised experience, financial stability, background check. Exam pass rate: ~42%. CE: 14 hours every 2 years. Cost: $145 application + exam fees + ~$800โ€“1,200 for prep course.
Required for Tier 3
Certified Building Contractor (CBC)
F.S. 489.105(3)(b) ยท CILB
Narrower scope than CGC โ€” residential and commercial construction excluding structural. Alternative path if new residential is the primary focus. Same general exam process and requirements as CGC. Many TruLux-type operators take the CBC as the faster path, then add CGC later. Useful for major renovations and additions (Tier 2 upper end).
Required for Tier 2 Upper
Registered GC / CBC (County-Level)
F.S. 489.117 ยท County-Specific
An alternative for Phase 1: partner with or hire a state-licensed GC who operates under TruLux Construction's brand. The licensed GC is named on permits; TruLux handles sales, client management, project oversight. Common structure for new GC businesses โ€” find an experienced CGC willing to license their name in exchange for salary or profit share while Traveus studies for CGC.
Phase 1 Bridge Strategy
Specialty Contractor Licenses (Subs)
Electrical, Plumbing, HVAC, Roofing
All trade work requires licensed subcontractors holding their own specialty licenses (EC, Master Plumber, CAC, CRC). TruLux as GC is NOT required to hold these โ€” it hires subs who do. Verify active license status on DBPR website before engaging any sub. Require certificate of insurance from every sub before they set foot on a project.
Subcontractors Handle These
๐Ÿค
Building the Subcontractor Network
The Asset That Compounds

The sub network is TruLux Construction's core asset โ€” the same way YouTube subscribers compound over time, a reliable sub network takes 12โ€“24 months to build but then becomes an uncopiable moat. Contractors who consistently give subs steady work, pay on time, and don't waste their time become the GC of choice. This is how you get pricing below market rates and priority scheduling.

Subs Required for Phase 1 Tier 1 Renovations
TradeLicense RequiredTypical RateHow to Source
General Laborer / DemoNone$25โ€“40/hrCraigslist, local FB groups
Flooring (tile, LVP, hardwood)None required$3โ€“8/sqft installedFloor stores, Angi/Thumbtack
Painting (interior/exterior)None under $25K FL$2โ€“5/sqftLocal painters, referrals
ElectricianEC License (FL)$75โ€“125/hrNECA directory, referrals
PlumberMaster Plumber (FL)$80โ€“150/hrPHC association, referrals
HVACCAC License (FL)$85โ€“140/hrACCA Florida, referrals
Drywall / TextureNone$1.50โ€“3.50/sqftLocal crews, FB groups
Cabinets / MillworkNone typicallyProject-basedLocal shops, IKEA installers
Sub Vetting Checklist (Every Sub, Every Time)
  1. 1. Verify active license on DBPR.MyFloridaLicense.com before first engagement
  2. 2. Certificate of insurance โ€” general liability ($1M minimum) + workers comp
  3. 3. Three past client references with specific project details
  4. 4. Signed subcontractor agreement (scope, timeline, payment schedule, lien waiver requirement)
  5. 5. IRS Form W-9 for 1099 reporting at year end
  6. 6. Payment terms: 50% at project start, 40% at milestone completion, 10% at punch-list sign-off
  7. 7. Lien waiver required at each payment โ€” conditional waiver at time of payment, unconditional upon clearing
  8. 8. First project: low-risk Tier 1 job only. Evaluate quality, communication, and schedule adherence before bigger work
๐Ÿ”—
Client Pipeline: How Construction Feeds from RE & Mortgage
The Integrated Revenue Engine

Construction doesn't need its own lead generation โ€” it feeds from the existing RE and mortgage pipelines. Every transaction becomes a construction discovery conversation. The touch points below represent systematic integration points where a construction need can be identified and converted.

Client Touch Point
Who Identifies Need
Avg Project Size
Conversion Rate
New buyer closing on fixer-upper
"What would you want to update first?"
RE agent at closing
$25Kโ€“$150K
25โ€“40% of buyers
Investor DSCR buyer
Needs rehab before rental
LO at application
$15Kโ€“$80K
40โ€“60% of investors
Seller pre-listing prep
Updates to maximize sale price
Listing agent
$5Kโ€“$40K
15โ€“25% of sellers
Post-close renovation
12-month post-close nurture sequence
Automated follow-up
$20Kโ€“$100K
10โ€“15% of past clients
STR/Airbnb conversion
Port Canaveral, Cocoa Beach investors
YouTube content โ†’ inbound
$30Kโ€“$120K
Growing niche
Ground-up new construction
Vacant lot buyer + construction-to-perm loan
RE + Mortgage integrated pitch
$250Kโ€“$600K+
Phase 3 only
๐Ÿฆ
Construction-to-Perm Financing: The Mortgage Integration Play
Highest Revenue Per Client Event
Construction Loan Products Available Through TruLux Mortgage
ProductStructureBest ForTruLux BPS
Construction-to-Perm (C2P)Single close: construction draw period โ†’ converts to 30-yr permNew builds, major additions250โ€“300 BPS on perm loan
203(k) Rehab Loan (FHA)Renovation costs rolled into purchase mortgageFixer-uppers under $750K225โ€“250 BPS
Fannie Mae HomeStyleConventional rehab โ€” includes luxury itemsConventional buyers w/ renovation plans225โ€“250 BPS
Fix & Flip Bridge LoanShort-term hard money, 6โ€“18 monthsInvestors, DSCR pre-stabilization200โ€“300 BPS
HELOC / Cash-Out RefiTap existing equity for renovationExisting homeowners with equity200โ€“250 BPS
The Integrated Stack โ€” Example Transaction
Scenario: Aerospace engineer relocating from California buys vacant lot in Viera for $90K, builds custom 2,500 sqft home for $450K using TruLux for all three verticals.
RE Commission (land purchase)$2,250
Construction-to-Perm mortgage (275 BPS on $450K)$12,375
Construction GC Margin (12% on $450K build)$54,000
RE Commission (when client sells in 5โ€“10 years)$11,250
Total from one client relationship$79,875+
โš™๏ธ
Project Management System
Essential for GC Reputation
Construction Project Management Tools
ToolCostBest For
Buildertrend$199โ€“$499/monthPhase 2โ€“3 full GC โ€” client portal, schedules, subs, financials, photos
Jobber$69โ€“$249/monthPhase 1 small remodels โ€” job scheduling, invoicing, quotes
CoConstruct$299+/monthCustom home builders specifically
Notion (DIY)$10/user/monthPhase 1 โ€” project boards, sub contact lists, inspection checklists
Recommendation: Start with Notion + Jobber in Phase 1. Graduate to Buildertrend in Phase 2 when managing 3+ simultaneous projects.
Critical Project SOPs (10 Minimum)
  • Estimating and bid process (line-item breakdown template)
  • Client contract and change order management
  • Permit pulling workflow by county (Brevard, Orange, Duval)
  • Sub scheduling and coordination protocol
  • Weekly client communication cadence (photos + progress update every Friday)
  • Material procurement and supplier accounts
  • Inspection scheduling and sign-off
  • Punch-list creation and completion
  • Lien waiver collection at every payment
  • Post-project client review request and referral ask
๐Ÿ“ˆ
Construction Division Phase-by-Phase Growth
Low-Risk, Milestone-Gated Entry
Phase 1 ยท Months 1โ€“12
Foundation: Small Renovations
Service TierTier 1 only
Project Size$5Kโ€“$40K
Volume Target1โ€“3 projects/month
Monthly Revenue$5Kโ€“$25K
Licensing NeededNone (sub trades licensed)
Team NeededTraveus + 1 VA coordinator
Key ObjectiveBuild sub network, prove quality
Phase 2 ยท Months 12โ€“24
Scale: Additions & Major Rehabs
Service TierTier 1 + Tier 2
Project Size$40Kโ€“$150K
Volume Target3โ€“6 projects/month
Monthly Revenue$25Kโ€“$80K
Licensing NeededCBC or GC partner
Team Needed+ Project Manager (US or PH)
Key ObjectiveTraveus CGC exam, Buildertrend
Phase 3 ยท Months 24โ€“36
Full GC: New Construction
Service TierAll three tiers
Project Size$50Kโ€“$600K+
Volume Target5โ€“10 concurrent projects
Monthly Revenue$60Kโ€“$150K+
Licensing NeededCGC active
Team Needed+ Estimator + Site Supervisor
Key ObjectiveFirst C2P loan closed, ground-up build
๐ŸŽฏ
The Long Game: A mature Construction division generating 6โ€“10 projects/month at an average margin of $20,000 per project produces $120,000โ€“$200,000/month in profit โ€” more than the mortgage and real estate divisions combined. This is why PLACE Inc., Compass, and the largest real estate teams are all pushing into construction and renovation services. TruLux is building toward this from day one, just with a phased, low-risk entry that matches licensing, sub network maturity, and cash flow reality.